In November, SSE confirmed that its remaining hard coal units at Fiddler’s Ferry power plant in the UK will close by 31 March 2020. According to our methodology, these units are being shut down in a manner consistent with the temperature goal in the Paris Agreement.
Download the flash note to read the analysis.
As an advisor to the CA100+ initiative, we look forward to working with SSE and its shareholders to reduce its reliance on gas generation in a manner consistent with the temperature goal in the Paris Agreement.